Road Stream Crossing Site PM_L022

Pere Marquette River Watershed, Baldwin River
24th St
Cherry Valley Twp, Lake County
Information collected by:
Site Location
GPS Coordinates: 43.944312 , -85.774341
T18N R12w Sec 20
Owned by Private
Fish Passability 0.9
Total Erosion: 3.2281 tons/year
Severity: Severe
Year Inventoried: 2014
Inlet
Outlet
Upstream Conditions
Downstream Conditions
Road Approach - Left
Road Approach - Right
Crossing Information
Type of Crossing: Bridge
Structure Material: Metal
Structure Substrate: Sand
General Conditions: Fair
Dimensions of Structure: Length 18 ft. , Width 23 ft. , Height 6 ft.
Structure Inlet
Water Depth: 1.7 ft.
Water Velocity*: 0.4 ft./sec.
Structure Outlet
Water Depth: 3 ft.
Water Velocity*: 0.8 ft./sec.
*Water Velocities were measured 1 ft. below Surface (with Meter)
Stream Information
Stream Flow: Less than Bankfull
Riffle Information
Water Depth: 1 ft.
Bankfull Width: 26 ft.
Wetted Width: 20 ft.
Water Velocity: 0.6 ft./sec. (Measured with Meter)
Dominant Substrate: Sand
Road Information
Gravel County Road
Road Condition: Good
Road Width at Culvert: 23 ft.
Location of Low Point: At Stream
Runoff Path: Roadway
Fill Depth: 0 ft.
Slope: 1:1.5
Fill Depth: 0 ft.
Slope: 1:1.5
Approaches
Left Approach
Length: 600 ft.
Slope: 1% to 5%
Vegetation: Heavy
LS Factor: 0.52
Erosion: 1.9769 tons/year
Right Approach
Length: 350 ft.
Slope: 1% to 5%
Vegetation: Heavy
LS Factor: 0.47
Erosion: 1.0423 tons/year
Erosion Information
Total Erosion at Crossing: 3.2281 tons/year
Extent of Erosion: Minor
Erosion is occurring and corrective actions can be installed to address the problem.
Notes: Road surface on approaches are washing into stream. Needs pavement in the future. Bridge "bumpers" are intact preventing sediment from washing over the bridge deck.
Location of Erosion
Erosion Dimensions
Eroded Material
Material Eroded
Total Erosion
facing downstream
Length
Width
Depth
Reaching Stream?
(tons/year)
Right Approach
350 ft.
3 ft.
0.1 ft.
yes
Sand
0.0385
Right Approach
350 ft.
3 ft.
0.1 ft.
yes
Sand
0.0385
Left Approach
600 ft.
3 ft.
0.1 ft.
yes
Sand
0.066
Left Approach
600 ft.
3 ft.
0.1 ft.
yes
Sand
0.066
Summary Information
Fish Passability 0.9
Erosion is an area of concern for this site. When bridge is eventually in need of replacement, need to pave the approaches.