Road Stream Crossing Site GTBAY_LEE029

West Bay Shoreline & Tributaries Watershed, Leo Creek
M-22
Suttons Bay Twp, Leelanau County
Information collected by:
Site Location
GPS Coordinates: 44.96730261 , -85.64419013
T30N R11W Sec 28
Owned by Private
Fish Passability 0
Total Erosion: 1.108 tons/year
Severity: Severe
Year Inventoried: 2020
Inlet
Outlet
Upstream Conditions
Downstream Conditions
Road Approach - Left
Road Approach - Right
Crossing Information
Type of Crossing: culvert(s)
Number of Structures: 1
Structure Shape: Round
Inlet Type: Wingwall 10-30 Degree
Outlet Type: At Stream Grade
Structure Material: Concrete
Structure Substrate: None
General Conditions: Good
Structure Interior: smooth
Dimensions of Structure: Length 77.9 ft. , Width 4.8 ft. , Height 4.8 ft.
Structure Inlet
Water Depth: 0.6 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 5.4 ft./sec.
Structure Outlet
Water Depth: 0.7 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 5.1 ft./sec.
*Water Velocities were measured 0.5 ft. below Surface (with Meter)
Additional Comments
Left approach is 1770ft., 999ft. entered because form will not take 4 digets
Stream Information
Stream Flow: Less than Bankfull
Riffle Information
Water Depth: 0.25 ft.
Bankfull Width: 18.6 ft.
Wetted Width: 11.6 ft.
Water Velocity: 0.6 ft./sec. (Measured with Meter)
Dominant Substrate: Sand
Road Information
Paved State Road
Road Condition: Fair
Road Width at Culvert: 41 ft.
Location of Low Point: At Stream
Runoff Path: Ditch
Embankments
Upstream
Fill Depth: 3.4 ft.
Slope: Less than 1:2
Downstream
Fill Depth: 2.4 ft.
Slope: Less than 1:2
Approaches
Left Approach
Length: 0 ft.
Slope: Less Than 1%
Vegetation: Partial
LS Factor: 0.05
Erosion: 0 tons/year
Right Approach
Length: 999 ft.
Slope: 1% to 5%
Vegetation: Partial
LS Factor: 0.8
Erosion: 1.0829 tons/year
Erosion Information
Total Erosion at Crossing: 1.108 tons/year
Extent of Erosion: Minor
Erosion is occurring and corrective actions can be installed to address the problem.
Location of Erosion
Erosion Dimensions
Eroded Material
Material Eroded
Total Erosion
facing downstream
Length
Width
Depth
Reaching Stream?
(tons/year)
Right Upstream Embankment
3.8 ft.
4.9 ft.
6 ft.
yes
Sand
0.0251
Summary Information
Fish Passability 0
These non-native species were observerd at this site: Queen Anne's Lace