Stream Bank Erosion Site PM-24
Total Severity: Moderate
Total Points: 35
Information collected by:
Pere Marquette River Watershed,
Pere Marquette River
Branch Twp,
Mason County
GPS Coordinates: 43.93785
, -86.08499
T18N
R15W
Sec 22
Owned by Federal
Bank Details
Which Bank? Right
Bank Aspect:S
Condition:Both toe and upper bank eroding
Erosion Trend:Increasing
Percent Veg. Cover: 10-50%
Bank Conditions
Stream Width:50 ft.
Stream Depth:4 ft.
Stream Current:Slow
Eroded Bank Length:120 ft.
Eroded Bank Height:25 ft.
Slope of Eroded Bank:3:1
Texture: Sand
Cause(s) of Erosion
-Bend in river
-Bank seepage
Recommended Treatment(s)
-Bank revegetation
-Tree revetments
General Information
Total Points
35