Stream Bank Erosion Site PM-094

Total Severity: Severe
Total Points: 37
Information collected by:
Pere Marquette River Watershed, Big South Branch
Branch Twp, Mason County
GPS Coordinates: 43.9016 , -86.15027
T18N R15W Sec 31
Owned by Federal
Bank Details
Which Bank? Right
Bank Aspect:SW
Condition:Both toe and upper bank eroding
Erosion Trend:Increasing
Percent Veg. Cover: 0-10%
Bank Conditions
Stream Width:35 ft.
Stream Depth:2 ft.
Stream Current:Slow
Eroded Bank Length:96 ft.
Eroded Bank Height:12 ft.
Slope of Eroded Bank:1:1
Texture: Sand
Cause(s) of Erosion
-Bend in river
Recommended Treatment(s)
-Bank revegetation
-Rock riprap
-Tree revetments
General Information
Total Points
37