Stream Bank Erosion Site NS-01

Total Severity: Moderate
Total Points: 31
Information collected by:
Huron Pines
Thunder Bay River Watershed, Thunder Bay River
Alpena Twp, Alpena County
GPS Coordinates: 45.07619 , -83.48009
T31N R8E Sec 17
Owned by Other
Site Access:Yes
Bank Details
Which Bank? Right
Bank Aspect:N
Condition:Toe and upper bank are eroding
Erosion Trend:Increasing
Percent Veg. Cover: 51-100%
Bank Conditions
Stream Width:300 ft.
Stream Depth:2 ft.
Stream Current:Slow
Eroded Bank Length:250 ft.
Eroded Bank Height:8 ft.
Slope of Eroded Bank:Vertical to 1H:1V
Texture: Sand over clay
Cause(s) of Erosion
-Bend in river
Recommended Treatment(s)
General Information
Project Details
Year Inventory Completed: 2018
Total Points
31