Stream Bank Erosion Site PM-19

Total Severity: Severe
Total Points: 36
Information collected by:
Pere Marquette RIver Watershed, Pere Marquette River
Branch Twp, Mason County
GPS Coordinates: 43.931455 , -86.04481
T18N R15W Sec 25
Owned by USA
2019
2019
2019
2019
2019
2019
2019
2019
2019
2019
Bank Details
Which Bank? Left
Bank Aspect:E
Condition:Both toe and upper bank eroding
Erosion Trend:Increasing
Percent Veg. Cover: 10-50%
Bank Conditions
Stream Width:40 ft.
Stream Depth:5 ft.
Stream Current:Fast
Eroded Bank Length:75 ft.
Eroded Bank Height:15 ft.
Slope of Eroded Bank:1:1
Texture: Clay
Cause(s) of Erosion
-Bend in river
-Bank seepage
Recommended Treatment(s)
-Bank revegetation
-Tree revetments
General Information
Project Details
Year Inventory Completed: 2019
Total Points
36