Stream Bank Erosion Site PM-21
Total Severity: Severe
Total Points: 40
Information collected by:
Pere Marquette RIver Watershed,
Pere Marquette River
Branch Twp,
Mason County
GPS Coordinates: 43.93644
, -86.07265
T18N
R15W
Sec 23
Owned by USA
Bank Details
Which Bank? Left
Bank Aspect:W
Condition:Both toe and upper bank eroding
Erosion Trend:Increasing
Percent Veg. Cover: 0-10%
Bank Conditions
Stream Width:50 ft.
Stream Depth:3 ft.
Stream Current:Fast
Eroded Bank Length:90 ft.
Eroded Bank Height:15 ft.
Slope of Eroded Bank:1:1
Texture: Sand
Cause(s) of Erosion
-Bend in river
-Bank seepage
Recommended Treatment(s)
-Rock riprap
-Cover structure
-Tree revetments
General Information
Project Details
Year Inventory Completed: 2019
Total Points
40