Stream Bank Erosion Site PM-228
Total Severity: Severe
Total Points: 34
Information collected by:
Pere Marquette RIver Watershed,
Pere Marquette River
Branch Twp,
Mason County
GPS Coordinates: 43.931
, -86.04103
T18N
R15W
Sec 25
Owned by USA
Bank Details
Which Bank? Left
Bank Aspect:N
Condition:Both toe and upper bank eroding
Erosion Trend:Increasing
Percent Veg. Cover: 10-50%
Bank Conditions
Stream Width:50 ft.
Stream Depth:5 ft.
Stream Current:Fast
Eroded Bank Length:35 ft.
Eroded Bank Height:6 ft.
Slope of Eroded Bank:1:1
Texture: Sand
Cause(s) of Erosion
-Bend in river
Recommended Treatment(s)
-Bank revegetation
-Tree revetments
General Information
Project Details
Year Inventory Completed: 2019
Total Points
34