Stream Bank Erosion Site PM-255

Total Severity: Moderate
Total Points: 31
Information collected by:
Pere Marquette RIver Watershed, Pere Marquette River
Branch Twp, Mason County
GPS Coordinates: 43.93499 , -86.07995
T18N R15W Sec 22
Owned by USA
2019
2019
2019
Bank Details
Which Bank? Right
Bank Aspect:W
Condition:Both toe and upper bank eroding
Erosion Trend:Increasing
Percent Veg. Cover: 0-10%
Bank Conditions
Stream Width:45 ft.
Stream Depth:3 ft.
Stream Current:Fast
Eroded Bank Length:15 ft.
Eroded Bank Height:3 ft.
Slope of Eroded Bank:1:1
Texture: Gravel
Cause(s) of Erosion
-Bend in river
Recommended Treatment(s)
-Rock riprap
-Tree revetments
General Information
Project Details
Year Inventory Completed: 2019
Total Points
31