Stream Bank Erosion Site PM-301

Total Severity: Severe
Total Points: 33
Information collected by:
Pere Marquette RIver Watershed, Pere Marquette River
Branch Twp, Mason County
GPS Coordinates: 43.93559 , -86.12439
T18N R15W Sec 20
Owned by State
Bank Details
Which Bank? Right
Bank Aspect:SE
Condition:Both toe and upper bank eroding
Erosion Trend:Increasing
Percent Veg. Cover: 0-10%
Bank Conditions
Stream Width:70 ft.
Stream Depth:3 ft.
Stream Current:Medium
Eroded Bank Length:25 ft.
Eroded Bank Height:12 ft.
Slope of Eroded Bank:2:1
Texture: Sand
Cause(s) of Erosion
-Foot traffic
Other causes: Illegal Camping
Recommended Treatment(s)
-Bank revegetation
-Rock riprap
General Information
Project Details
Year Inventory Completed: 2016
Total Points
33