Road Stream Crossing Site EUP_BMIC_RSX103

Waishkey River Watershed, Unnamed
Chippewa County
Information collected by:
Bay Mills Indian Community
Site Location
GPS Coordinates: 46.38084,-84.5515
T 046NN R 002W Sec 15
Fish Passability: Barrier
Perch Height: 0.083 ft.
Total Erosion: 0.13 tons/year
Overall Score: 31
Severity: Severe
Date Inventoried: 12/1/2020
Crossing Information*
Type of Crossing: Culvert(s)
Number of Structures: 1
Structure Shape: Round
Inlet Type: Projecting
Outlet Type: Freefall into Pool
Structure Material: Plastic
Structure Substrate: None
General Conditions: Moderate to major deterioration from corrosion or abrasion (less than 5% of the structure has small holes or is nearly rusted through) or cracking or spalling or chipping (several small cracks or moderate chipping in the concrete). OR Moderate shape changes (described above).
Structure Interior: Smooth
Is Structure Rusted through? No
Dimensions of Structure: Length 61 ft. Width 4 ft. Height 4 ft.
Percentage Plugged: None or 0%
Percentage Crushed: 21% - 40%
Perch Height: 0.083 ft.
Structure Inlet
Water Depth: 0.375 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 0.33 ft./sec.
Structure Outlet
Water Depth: 0.083 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 1 ft./sec.
*Water Velocities were measured at the surface (via Float Test).
Stream Information
Stream Flow: < 1/2 Bankfull – The stream channel is less than half filled with water.
Stream Flow Type: Perennial (if flowing during the time of assessment.)
Is Scour Pool Present? Yes
Scour Pool: Length 10 ft., Width 7 ft., Depth 1.75 ft.
Is Upstream Ponding Present? No
Riffle Information
Road Information
Road Surface: Paved
Owner: County
Road Condition: New Pavement or Well Graded, Same condition as initial placement.
Road Core Integrity: Good (no symptoms of lack of integrity)
Road Width at Culvert: 22.5 ft.
Location of Low Point: At Stream
Runoff Path: Ditch
Embankments
Upstream
Fill Depth: 16 ft.
Slope: Moderate, 2:1, 22.5°, or 41%
Downstream
Fill Depth: 17 ft.
Slope: Moderate, 2:1, 22.5°, or 41%
Approaches
Left Approach
Length: 100 ft.
Slope: 1-5%
Vegetation: Heavy, Ditch is fully vegetated or rip-rapped with no signs of erosion.
Erosion Estimate: 0.03 tons/year
Right Approach
Length: 300 ft.
Slope: 1-5%
Vegetation: Heavy, Ditch is fully vegetated or rip-rapped with no signs of erosion.
Erosion Estimate: 0.1 tons/year
Erosion Information
Estimate of Total Erosion at Crossing: 0.13 tons/year
Summary Information
Fish Passability: Barrier
Is a future visit to this site recommended? No
Were any non-native species observerd at this site? No