Road Stream Crossing Site EUP_Pickford 5

Munuscong River Watershed
Chippewa County
Information collected by:
MiDNR
Site Location
GPS Coordinates: 46.2120558,-84.4750338
T 044N R 001 Sec 18
Fish Passability: Not Assessed
Structure is NOT Perched
Total Erosion: 0.05 tons/year
Overall Score: 26
Severity: Moderate
Date Inventoried: 10/6/2021
Road Approach - Left
Road Approach - Left
Road Approach - Right
Road Approach - Right
Inlet
Inlet
Upstream Conditions
Upstream Conditions
Outlet
Outlet
Downstream Conditions
Downstream Conditions
Site Sketch
Site Sketch
Crossing Information*
Type of Crossing: Culvert(s)
Number of Structures: 1
Structure Shape: Round
Inlet Type: Projecting
Outlet Type: At Stream Grade
Structure Material: Metal
Structure Substrate: Mixture
General Conditions: Severe deterioration from corrosion or abrasion (more than 50% of the structure is rusted through) or cracking or spalling or chipping (more than 50% of the structure is compromised). Or Major shape changes (described above) reducing the capacity of the structure by greater than 50%. OR Segment disconnect causing major subsurface erosion/piping and/or partial fill failure and/or sink holes in the fill.
Structure Interior: Corrugated
Is Structure Rusted through? Yes
Dimensions of Structure: Length 24 ft. Width 0.75 ft. Height 0.75 ft.
Percentage Plugged: 81% - 100% Inlet,Outlet
Percentage Crushed: 1% - 20%
Structure is NOT Perched
Structure Inlet
Water Depth: 0 ft.
Embedded Depth of Structure: 0.4 ft.
Water Velocity*: 0 ft./sec.
Structure Outlet
Water Depth: 0 ft.
Embedded Depth of Structure: 0.7 ft.
Water Velocity*: 0 ft./sec.
*Water Velocities were measured at the surface (via Float Test).
Stream Information
Stream Flow: None – The streambed is dry and there is no water flow.
Stream Flow Type: Concentrated Wetland Flow.
Is Scour Pool Present? No
Is Upstream Ponding Present? No
Riffle Information
Road Information
Road Surface: Native Surface
Owner: State
Manager: DNR Forest Resources Division
Road Condition: Old Pavement or Rutted, Minor cracking or rutting/ponding at crossing all or part of crossing length.
Road Core Integrity: Fair (some of the symptoms may be present, but not to an extent posing high risk to the crossing)
Road Width at Culvert: 10 ft.
Location of Low Point: Other
Runoff Path: Roadway
Embankments
Upstream
Fill Depth: 1 ft.
Slope: Gentle, 3:1, 15°, or 33%
Downstream
Fill Depth: 1.5 ft.
Slope: Gentle, 3:1, 15°, or 33%
Approaches
Left Approach
Length: 50 ft.
Slope: 1-5%
Vegetation: Heavy, Ditch is fully vegetated or rip-rapped with no signs of erosion.
Erosion Estimate: 0.05 tons/year
Right Approach
Length: 0 ft.
Slope: 1-5%
Vegetation: Heavy, Ditch is fully vegetated or rip-rapped with no signs of erosion.
Erosion Estimate: 0 tons/year
Erosion Information
Estimate of Total Erosion at Crossing: 0.05 tons/year
Summary Information
Fish Passability: Not Assessed
*These data are maintained in the Michigan DNR Road Stream Crossing Inventory.